Patents for E01D 21 - Methods or apparatus specially adapted for erecting or assembling bridges (6,388) |
---|
06/01/2011 | CN201850512U Steel arched tower |
06/01/2011 | CN201850511U Rapid stay cable sleeve lofting positioner |
06/01/2011 | CN201850510U Inverted triangular support of cast-in-situ box girder |
06/01/2011 | CN201850509U Auxiliary device for preserving pore passages in concrete bridges |
06/01/2011 | CN201850508U Non-strut bridge pier template |
06/01/2011 | CN102080358A Single beam girder erecting machine |
06/01/2011 | CN102080357A Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket |
06/01/2011 | CN102080356A Box girder positioning temporary supporting seat and positioning construction method of box girder |
06/01/2011 | CN102080355A Method for installing arch support of steel tube arch bridge |
06/01/2011 | CN102079313A Vehicle combined body for railway rail laying and bridging machine |
06/01/2011 | CN101736697B Construction method for pushing and furling complete bracket of steel box girders |
05/25/2011 | CN201843088U Steel wire prestress tensioning device |
05/25/2011 | CN201843087U Bottom plate packing structure for steel overhead bin |
05/25/2011 | CN201843086U Bridge pier outer formwork |
05/25/2011 | CN201843085U Internal model of bridge pier |
05/25/2011 | CN201843084U Single-box multi-room box girder template |
05/25/2011 | CN201843083U V-shaped support frame |
05/25/2011 | CN201843082U Embedded steel plates for installing hanging baskets of piers |
05/25/2011 | CN201843081U Flexible leg anchoring device of bridge girder erection machine with single nose girder |
05/25/2011 | CN201843080U Double-beam steel stranded wire strand pulling machine |
05/25/2011 | CN201843079U Steel pulley for component installation |
05/25/2011 | CN201843078U High-speed railway frame bridge construction forming device |
05/25/2011 | CN201843077U Pile casing used on high-oblique rocky river bed of shallow soil covering layer |
05/25/2011 | CN201842226U Air pressure floating barrel |
05/25/2011 | CN102071683A Water drill dug pile construction method |
05/25/2011 | CN102071650A Inside and outside general bridge girder erection machine for high speed railway tunnel and girder erecting technology thereof |
05/25/2011 | CN102071649A System special for hoisting and dismounting bailey frames |
05/25/2011 | CN102071648A Method and device for correcting box steel girder in construction |
05/25/2011 | CN102071647A Method for mounting dismountable steel trestle |
05/25/2011 | CN102071646A Large-tonnage box girder sea system and construction method |
05/25/2011 | CN102071645A Bridge bored pile hole wall opening protection method |
05/25/2011 | CN102071644A Lifting installation method of integral bridge arch rib |
05/25/2011 | CN102071643A Method for erecting bridge |
05/25/2011 | CN102071642A Improvement method for slideway during pushing construction of steel truss girder |
05/25/2011 | CN102071641A Integral bridge girder erection machine of distributed landing leg type transportation rack of concrete beam packing bridge crane and bridge girder erection engineering method thereof |
05/25/2011 | CN102071640A Waterproof method for bridge expansion joint device |
05/25/2011 | CN101210416B Semi-flexible supporting device for large span steel box girder incremental launching method construction |
05/19/2011 | WO2011059145A1 Structure using steel pile |
05/18/2011 | EP2321463A1 Shuttering method and system for producing a bridge |
05/18/2011 | CN201835233U Single-beam bridge erecting machine |
05/18/2011 | CN201835232U Pre-pressing system for main trusses of cradle |
05/18/2011 | CN201835231U Mobile rotating four-corner stable water pressure ejecting bridging device |
05/18/2011 | CN102061668A Vertical swiveling construction method of dual-steel-arch tower |
05/18/2011 | CN101818481B Device for performing incremental launching construction on bridge by using multi-roller sliding ways and construction method thereof |
05/11/2011 | CN201826292U Bare rock steel pipe pile platform in steep slopes under deep sea |
05/11/2011 | CN201826264U Railroad bridge L-shaped ballast blocking block template |
05/11/2011 | CN201826263U Tower-free cable-stayed buckling device for installing arch bridge and arch rib |
05/11/2011 | CN201826262U Prestress tensioning trolley |
05/11/2011 | CN201826261U Mold support for bridge construction on stream |
05/11/2011 | CN201826260U Bridge drag chute device |
05/11/2011 | CN201826259U Large-tonnage rubber-tyred girder carrying car |
05/11/2011 | CN201826258U Steel support buttress fixing device |
05/11/2011 | CN201826249U Self-anchored hybrid beam cable-stayed suspension cooperative system bridge |
05/11/2011 | CN102051860A Bridge erecting and track laying machine for railway |
05/11/2011 | CN102051859A Synchronous and fast construction method and device for cantilever-cast continuous girder No.0 block and lower structure |
05/11/2011 | CN102051858A Jack loading triangular truss hanging basket and load test construction method thereof |
05/11/2011 | CN102051853A Combined emergency bridge and erection method thereof |
05/11/2011 | CN101694087B Method for building novel bridge |
05/11/2011 | CN101476393B Pretensioned prestressing stretch-drawing beam and its production method |
05/05/2011 | WO2011052184A1 Artificial ground for roads and the like, and method of constructing same |
05/04/2011 | CN201818041U Bendable bamboo veneer |
05/04/2011 | CN201817777U Cantilever crane structure of highway bridge erecting machine |
05/04/2011 | CN201817776U Rearward rotary foldable cantilever beam system of main machine of lower guide beam walking-type railway bridge girder erection machine |
05/04/2011 | CN201817775U External mold assembly capable of vertical motion |
05/04/2011 | CN201817774U Triangular support of support system |
05/04/2011 | CN201817773U Adjustable spherical hinge holder jacking |
05/04/2011 | CN201817772U Slewing device for turning bridge erecting equipment |
05/04/2011 | CN201817771U Anchor ear for bridge deepwater pile foundation construction |
05/04/2011 | CN201817757U Tension device of sliding layer with two geotextile layers and one geotextile film |
05/04/2011 | CN102041784A Horizontal rotation construction technology of oversized, overweight and special-shaped construction member through multipoint hoisting and horizontal rotation hanger |
05/04/2011 | CN102041783A Device for water-carrying grinding-in of grinding core and grinding cover of spherical hinge used in bridge rotation construction |
05/04/2011 | CN102041782A Multi-point pushing system of large-span steel truss girders and pushing process thereof |
05/04/2011 | CN102041781A Enclosed lake beam type steel bridge installation method based on portal crane |
05/04/2011 | CN102041780A Moving beam trolley and method for horizontally and vertically moving beams using same |
05/04/2011 | CN102041779A Erection crane and construction method thereof |
05/04/2011 | CN102041778A Method for constructing precast coping for bridge |
05/04/2011 | CN101793011B Construction method for large-span overwater bridge |
05/04/2011 | CN101736700B Construction method for hoisting broad width steel box girder cantilever |
05/04/2011 | CN101736698B Accurate positioning method for cable-stayed bridge pylon cable guide pipe |
05/04/2011 | CN101725115B Fixed hoisting bracket device for pushing steel box girder and construction method thereof |
05/04/2011 | CN101672019B Suspended basket external spherical pressing wheel device |
05/04/2011 | CN101660295B Hoisting method of arch bridge arch rib or beam body along bridge direction |
04/28/2011 | DE102006060695B4 Verfahren zur Herstellung von zwei- oder mehrfeldrigen Stahlverbundbrücken Process for the preparation of di- or multi-span composite steel bridges |
04/27/2011 | CN201809726U Straddle-type bridge girder erection machine |
04/27/2011 | CN201809725U Trough-shaped bridge pedestal |
04/27/2011 | CN102031874A Intelligent type synchronous prestress tensioning system |
04/27/2011 | CN102031758A Simply supported structure bridge horizontal swivel construction system and method |
04/27/2011 | CN102031757A Method for constructing bottom plate guide layer of jacked-in frame bridge |
04/27/2011 | CN102031756A Support assembly and construction method of cast-in-place box girder |
04/27/2011 | CN102031755A Multifunctional permanent template for girder bridge gravity type pier |
04/27/2011 | CN102031754A Intelligent horizontal cable releasing method |
04/27/2011 | CN102031753A Temporary support for bridge construction |
04/27/2011 | CN101768925B Mounting equipment of beam falling prevention stopping block and construction method thereof |
04/26/2011 | CA2717260A1 Method for constructing precast coping for bridge |
04/21/2011 | WO2011005009A3 Upper part structure for a continuous bridge, which efficiently supports negative moment and has improved constructability, and method for constructing same |
04/20/2011 | CN201802077U Bullet-shaped sleeve head for steel strand wire to penetrate curve section of prestressing pipeline |
04/20/2011 | CN201801820U Safety-protecting externally-hung device of falling object-resistant hanging basket |
04/20/2011 | CN201801819U Stress and deformation early-warning system for hanging basket |
04/20/2011 | CN201801818U Bridge erecting machine capable of erecting double-track twin beams at tunnel entrance by zero distance |
04/20/2011 | CN201801817U Highway double-guide beam bridge erecting machine |