Patents for E01D 21 - Methods or apparatus specially adapted for erecting or assembling bridges (6,388) |
---|
11/23/2011 | CN202047600U Lengthened sleeve for tool anchor |
11/23/2011 | CN202047376U Walking rail device for hanging basket forward shifting |
11/23/2011 | CN202047375U Universal bridging machine for inside and outside high-speed railway tunnel |
11/23/2011 | CN202047374U Triangle hanging basket for construction on small pier top |
11/23/2011 | CN202047373U Novel suspension device for hanging basket |
11/23/2011 | CN202047372U Box girder outside film with straight web structure |
11/23/2011 | CN202047371U Cofferdam structure of island built through bridge |
11/23/2011 | CN202047370U Prestressed reinforcing steel tensioning device and prestressed tensioning system of concrete bridge |
11/23/2011 | CN202047369U Case-type steel main beam rectifying device used during construction |
11/23/2011 | CN102251668A Shoal swampy zone wind power construction method, bearing buoyancy tank and tower barrel fixing device |
11/23/2011 | CN102251487A Double oblique steel arch tower in-situ cantilever assembling method |
11/23/2011 | CN102251486A Jacking bracket system for segmented mounting of bridge tower and construction process thereof |
11/23/2011 | CN102251485A Bridge erection machine aided support leg structure |
11/23/2011 | CN102251484A Hanger structure of bridge girder erection machine |
11/23/2011 | CN102251483A Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane |
11/23/2011 | CN102251482A Construction method for connection part of bridge lapping slab and cement stabilized base |
11/23/2011 | CN102251481A Railway pier layered construction method and construction device |
11/23/2011 | CN102251480A Small pier top construction triangular hanging basket |
11/23/2011 | CN102251479A Device and method for positioning and adjusting corrugated steel webs |
11/23/2011 | CN102251478A Control method for synchronous construction survey of pylons and beams of cable-stayed bridge |
11/23/2011 | CN102251477A Traversing construction method for tie bar arch |
11/23/2011 | CN102251476A Measurement control method for field installation of steel tube lattice pier |
11/23/2011 | CN102251475A Position changing platform and carrying frame integrated machine and bridge erection method |
11/23/2011 | CN102251465A Suspension bridge with bearing cable having X-shaped curve |
11/23/2011 | CN101974884B Tower-type triangular bracket system |
11/23/2011 | CN101967796B Method for arranging parallel steel wire stay cable |
11/23/2011 | CN101935985B Mid-span closure method for steel box girder of cable stayed bridge |
11/23/2011 | CN101929127B Method for preparing overlay of bridge expansion joint |
11/23/2011 | CN101695984B Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge |
11/23/2011 | CN101457514B Cable stayed bridge construction method |
11/22/2011 | US8060966 Method and apparatus for bridge construction |
11/16/2011 | CN202039301U Adjustable internal-mold back frame for cradle |
11/16/2011 | CN202039300U Hanging bracket for bridge cantilever casting construction |
11/16/2011 | CN202039299U Totally-closed hanging basket |
11/16/2011 | CN202039298U Umbrella-type steel frame supporting device of hollow slab beam core mould |
11/16/2011 | CN202039297U Air-liquid bag type scaffold for roads, buildings and bridges |
11/16/2011 | CN202039296U Synchronous hydraulic tensioning device for micro-control prestressed bridge steel strand |
11/16/2011 | CN102242540A Large-span steel-structure box beam and collision-prevention wall integrated construction technology |
11/16/2011 | CN102011366B Construction method for mud jacking of post-tensioning pre-stressed concrete box girder pipe |
11/16/2011 | CN101935982B Method for setting up bent cap form bracket of isolated pier |
11/09/2011 | CN202031038U Rhombic hanging basket for small pier-top construction |
11/09/2011 | CN202031037U Running guide device of descending hanging basket |
11/09/2011 | CN202031036U Cradle side form support device |
11/09/2011 | CN202031035U Side mould limiting platform |
11/09/2011 | CN202031034U Composite front supporting seat of hanging basket main truss |
11/09/2011 | CN202031033U Hang fill construction hanging basket for four-lane broad width continuous beam of high-speed railway |
11/09/2011 | CN202031032U Direction-changeable wheeled running system for cradle |
11/09/2011 | CN202031031U Novel drip forming mold |
11/09/2011 | CN202031030U Support installation positioner |
11/09/2011 | CN202031029U Cross-arch rib gantry crane |
11/09/2011 | CN102234982A Circular pier capping beam supporting device |
11/09/2011 | CN102234981A Cable-stayed hanging basket travel hoisting device |
11/09/2011 | CN102234980A Method for manufacturing standard component of steel beam for bridges |
11/09/2011 | CN102234979A Main pier steel sinking well for bridge and process for integrally hoisting and installing steel sinking well sections thereof |
11/09/2011 | CN101876207B Guiding device for assembling spatial diagonal web member |
11/09/2011 | CN101761033B Bionic leg system for machine cat type railway bridge erecting machine |
11/09/2011 | CN101705661B Method for constructing bridge over ravine |
11/09/2011 | CN101672018B Trackless hanging bracket with traveling truss |
11/03/2011 | US20110265274 Bridge Deck Replacement Machine and the Method of Bridge Deck Replacement Using the Same |
11/02/2011 | CN202023369U Pinch roller type chain reeving device |
11/02/2011 | CN202023157U Supporting seat for hanging basket track to move forward |
11/02/2011 | CN202023156U Symmetric segment elevating bridge erecting machine |
11/02/2011 | CN202023155U Bridge erecting machine capable of feeding beam at side |
11/02/2011 | CN202023154U Trestle vase-shaped column-type pier forming mold |
11/02/2011 | CN202023153U Suspension installation structure for propulsion hanger frame |
11/02/2011 | CN202023152U Super-low segment elevating bridge erecting machine with one end being anchored |
11/02/2011 | CN202023151U Movable exterior projecting operation platform |
11/02/2011 | CN202023150U Reaction frame pre-pressing system used in bridge hanging basket construction |
11/02/2011 | CN202023149U Hanging basket used in construction |
11/02/2011 | CN202023148U Continuous dragging device for prestressed concrete curved box girder |
11/02/2011 | CN202023123U Rapid transit railway ballastless track sliding layer pre-tensioning laying device |
11/02/2011 | CN102230314A Cable-stayed cradle structure |
11/02/2011 | CN102230313A Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof |
11/02/2011 | CN102230312A Cable-stayed cradle cambered head |
10/30/2011 | CA2702546A1 Bridge constructions and method of replacing bridges |
10/27/2011 | WO2011133828A2 Compressed fluid building structures |
10/26/2011 | EP2380694A1 Assembling table for I-beams |
10/26/2011 | CN202017181U Falsework for constructing steel and concrete combined beam crossing over conventional route and arranged parallel to existing line |
10/26/2011 | CN102102340B Installation method of bridge expansion and contraction device |
10/26/2011 | CN101942811B Auxiliary travel device for bridge girder erection machine |
10/19/2011 | CN202012048U Wire retaining plate for intelligent cable |
10/19/2011 | CN202012047U Steel strand inclined pulling and buckling system of tower |
10/19/2011 | CN202012046U Supporting beam for formwork of high-speed rail |
10/19/2011 | CN202012045U Combined steel frame structure for jacking in underpass bridge |
10/19/2011 | CN102220742A Construction method of deformable template of variable cross-section high pier |
10/19/2011 | CN102220741A Steel-concrete composite girder construction technology striding current lines and being parallel to existing lines |
10/19/2011 | CN102220740A Cantilever-concreting construction hanging basket for four-lane and wide-width continuous beam of high-speed rail |
10/19/2011 | CN102220739A Corrugated steel web prestressed concrete continuous box girder and construction method thereof |
10/19/2011 | CN101974885B Concrete one-step molding construction method for railway continuous-box beam multi-slope heightening platform |
10/19/2011 | CN101864737B Secondary vertical rotating construction method for arch rib of long-span steel arch bridge |
10/19/2011 | CN101644030B Beam section pulling, shifting and combining device used for spanning and pushing auxiliary closure in cable stayed bridge |
10/12/2011 | CN202007386U Transverse translation flat car |
10/12/2011 | CN202007385U Connecting device for bottom die and side die of high pier coping construction template in highway |
10/12/2011 | CN202007384U Connecting device for bottom die and side die of suspended steel box in water |
10/12/2011 | CN202007383U High-voltage insulating suspension basket |
10/06/2011 | WO2011122466A1 Suspension bridge stiffening girder and construction method for suspension bridge stiffening girder |
10/05/2011 | CN202000270U Adjustable rear wheel running gear for cradle |
10/05/2011 | CN202000269U Suspended casting construction hanging basket with underneath type main trusses |
10/05/2011 | CN202000268U Foldable front outrigger for bridge girder erection machine |
10/05/2011 | CN202000267U Sliding form device for concrete barrier |