Patents
Patents for E21F 15 - Methods or devices for placing filling-up materials in underground workings (1,589)
02/2014
02/27/2014US20140056646 Apparatus and method for mining coal
02/26/2014CN103603689A Curtain grouting construction method for treating mined-out areas
02/26/2014CN103603688A Gob-side entry three-dimensional reinforcement filled wall structure and filling method thereof
02/26/2014CN103603682A Roof supporting method applicable to cutting, drifting and cemented filling mining
02/26/2014CN103603665A Hanging wall side orebody extracting method in mine mining range
02/26/2014CN102865103B Distributed using method for mine underground water
02/19/2014CN103590851A Underground waste-rock concrete preparation, pumping and filling system and method
02/19/2014CN103590832A Pillar pre-isolation sublevel stick-filling mining method and ore body therefor
02/19/2014CN103590830A Open pit and underground space-time synchronous mining method for multiple-ore body
02/18/2014CA2685783C Collapsible cushion
02/13/2014DE102012015760A1 Self-confirming displacement material for air-filled carnallitit degradation, is obtained by mixing specified amount of magnesium chloride hexahydrate and saturated magnesium chloride solution, and adding specified amount of additive
02/12/2014CN203430567U Vertical type heat preservation sand silo
02/12/2014CN203430566U Intensive mine filling system
02/12/2014CN203430565U High pressure hydraulic gate valve
02/12/2014CN203430536U Filling support punning mechanism with outer limiting device
02/12/2014CN103573287A Method for determining thickness of flexible material of roadside flexible-strength double-layer composite support in gob-side entry retaining
02/05/2014CN203420734U 灌浆装置 Filling device
02/05/2014CN203420733U Goaf filling dehydration filter cloth rapid determining device
02/05/2014CN103557029A Method for transition from non-pillar sublevel caving method to upward horizontal cut-and-fill method
02/05/2014CN103557001A Low-section-height drift-pillar-free shrinkage-stoping, subsequent-filling and mining method
01/2014
01/30/2014DE102005015524B4 Verfahren zur dauerhaften Sicherung von abgeworfenen Bergwerksschächten A process for the permanent preservation of dropped mine shafts
01/29/2014CN203412608U Support core type hydraulic bracket in coal mining and filling parallel operation
01/29/2014CN203412607U Hydraulic support for realizing placing top coal and filling operation
01/29/2014CN203412606U Spider type hydraulic bracket in parallel working of coal mining and filling
01/29/2014CN103541764A Filling slurry stope height accurate indicator and early warning method thereof
01/29/2014CN103538149A Ultrahigh water material composite solid waste pulping, delivering and mixing device
01/23/2014US20140023444 Stope Fill Barrier
01/22/2014CN103527200A Sill-pillar-free sublevel rhombus room subsequent filling mining method
01/22/2014CN103527197A Solid cementing lane-type mining method for ultra thick seam
01/22/2014CN103527196A Method for recovery of room-type coal pillar through loess filling
01/22/2014CN103527195A Method for separately mining and transporting thick coal seam with gangue and backfilling goaf
01/20/2014CA2821448A1 Stope fill barrier
01/15/2014CN203394582U Grouting type filling retaining wall and goaf filling system
01/15/2014CN103510984A Method for designing filling mining mass ratio of solid filling and coal mining
01/15/2014CN102493838B Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam
01/08/2014CN203383851U Gob-side entry retaining flexible filling wall body structure
01/08/2014CN203383843U Thin coal seam filling and coal mining bracket
01/08/2014CN203383842U Three-column-type paste-filling hydraulic support used for underground thin coal seam
01/08/2014CN103498697A Filling and construction method for goaf below tunnel
01/08/2014CN103498696A Method for grouting, filling and compacting goaf filling body from roof roadway
01/08/2014CN103498695A Method for filling and restoring soluble potassic salt ore shaft solution cavity
01/08/2014CN102678121B Layered top-controlling filling mining method for residual ores in deep hole in diskless area
01/01/2014CN103485820A Filling wall body capable of protecting laneway through soft yielding in non-chain-pillar filling mining and construction method thereof
01/01/2014CN103485819A Method for inverted step bag type filling of large dip angle coal seam gob
01/01/2014CN103485818A Stope roof caving space filling equipment and roof contacting method thereby
01/01/2014CN102644464B Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
12/2013
12/25/2013CN103470304A Method for recharging magnesium chloride mother solution into potash salt ore gob
12/25/2013CN103470303A Mine filling system and filling method thereof
12/25/2013CN102619513B Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
12/25/2013CN102493839B Method for filling gob
12/25/2013CN102444401B Coal mining method by filling on blasting mining face of thin coal seam and relevant equipment
12/25/2013CN102337925B Method for enlarging, filling and supporting coal-pillar-free mining roadway for fully-mechanized top coal caving
12/25/2013CN102155256B Method for preventing gas extraction hole from collapsing
12/18/2013CN203347838U Mine mortar air compressor capable of being monitored
12/18/2013CN203347836U Scraper conveyor box type double middle plate gangue backfill middle trough
12/18/2013CN103452795A Method and device for improving filling capacity of filling pumps by double-pump confluence
12/18/2013CN103452586A Gob expanding material prestressed filling method and prestressed filling material
12/18/2013CN102505961B Large horizontal sand silo suitable for combined filling of mortar in dressing plants and dry tailings in tailings ponds
12/18/2013CN102434182B Filling hydraulic bracket with automatic bag overturning mechanism
12/11/2013CN102500590B Method for automatically flushing full pipe
12/04/2013CN203321583U Vertical sedimentation sand silo
12/04/2013CN103422884A Construction technology for formwork making and filling among gob-side entry retaining supports
11/2013
11/27/2013CN203308511U Pneumatic grouting pump
11/27/2013CN203308510U Tamping mechanism for hydraulic support and hydraulic support
11/27/2013CN203308509U Grid steel frame type filling siding wall
11/27/2013CN103410545A Hydraulic support capable of realizing top coal caving and filling operation
11/27/2013CN102425155B Method for reinforcing overlying shallow rockmass in mined-out area
11/20/2013CN203296815U Mine filling grouting special-shaped quick coupling device
11/20/2013CN203296814U Tailing panel wall for mining engineering
11/20/2013CN103397907A Water drainage wall adopting brick structure and used in cut-and-fill stoping method
11/20/2013CN103397906A Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method
11/20/2013CN103397905A System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
11/13/2013CN203285484U Solid filling coal mining automatic control system
11/13/2013CN103388488A Thin seam gob-side entry retaining filling method
11/13/2013CN102562068B Mine subsequent cemented and non-cemented filling mining method
11/06/2013CN103382849A Method for filling paste behind filling hydraulic supports
11/06/2013CN103382848A Gob-side entry retaining method reserving shed legs for filling
11/06/2013CN102619543B Mobile type hydraulic airtight filling device
11/06/2013CN102518438B Roof regeneration medium-length hole ore blast backfill mining method
10/2013
10/30/2013CN203257463U Filling guiding mechanism of solid filling conveyor
10/30/2013CN203257462U Ultra-thin coal seam filling mining hydraulic support high-speed throwing device
10/30/2013CN203257461U Rapid filling mechanism for filling coal mining conveyor
10/30/2013CN203257460U Potable gangue-blocking cage
10/30/2013CN102425454B Construction method of walling and filling combined gob-side entry retaining wall body
10/24/2013WO2012063009A3 Method for extinguishing coal mine fires and unit for performing said method
10/23/2013CN203248193U Connecting old lane filling system of underground coal mine
10/23/2013CN203248192U Connecting old lane filling framework of underground coal mine
10/23/2013CN103362548A 灌浆装置 Filling device
10/23/2013CN103362547A Underground feeding buffer for coal mine filling mining
10/23/2013CN103360011A Carnallite mine goaf filling method
10/16/2013CN103352722A Cemented filling close to back processing technology for goaf at barren rock filling background
10/09/2013CN102367741B Mortar making system and process suitable for large horizontal sand silo of mine filling station
10/02/2013CN203223251U Gangue blocking rail for filling gangue mining bin
10/02/2013CN203223250U Filling milling ground batch charging system
10/02/2013CN203223249U Deep well slurry full-pipe gravity-flow mobile pumped filling system
10/02/2013CN103334785A Gob-side entry retaining flexible infilled wall body structure and filling method thereof
10/02/2013CN103334784A Solid filling inclined material feeding method
10/02/2013CN102071941B Fully mechanized mining gob-side entry retaining-based concrete block staggered joint longitudinal stacking wall forming method
09/2013
09/26/2013US20130251454 Mine seal with electrically non-conductive ties
09/25/2013CN203214097U Mining mortar air compressing device
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 16