Patents for E02D 5 - Bulkheads, piles, or other structural elements specially adapted to foundation engineering (16,463) |
---|
08/19/2010 | WO2010091453A1 A structural member |
08/18/2010 | CN201554047U Grouting pipe used for repairing defects of underground building curtain by grouting method |
08/18/2010 | CN201554023U Machine and tool for casting concrete on vertical shield piles on site |
08/18/2010 | CN201554021U Switching device for pouring equipment of concrete bored pile |
08/18/2010 | CN201554020U Rhombus-shaped concrete pile |
08/18/2010 | CN101806150A Effective and safe anti-slide pile construction method |
08/18/2010 | CN101806118A Hollow sea sand concrete component and preparation method |
08/18/2010 | CN101806116A Hollow recycled concrete component and preparation method |
08/18/2010 | CN101806072A Cement soil slurry sampler with cement soil mixing pile |
08/18/2010 | CN101806070A Free-standing low pile cap dock wall structure with double rows of piles as foundation |
08/18/2010 | CN101806061A Anchorage unit and construction method using same to ream ground anchor |
08/18/2010 | CN101806060A Prestressed cuboid support pile for building foundation pit, manufacturing method thereof and forming die |
08/18/2010 | CN101806040A Underpinning device and method for bridge and building |
08/18/2010 | CN101298777B Method and device for preventing land slide of swelled ground |
08/18/2010 | CN101078212B Anchorage and removing method thereof |
08/17/2010 | US7775746 PHC pile used in permanent retaining wall structure and connection method of PHC pile |
08/12/2010 | WO2010090577A1 Arrangement for a down-the-hole hammer drill for use in soil consolidation through jet grouting |
08/12/2010 | WO2010089985A1 Steel member for foundation, method of driving steel member for foundation, and continuous steel wall for foundation |
08/12/2010 | WO2010089966A1 Compound steel sheet pile, continuous wall utilizing compound steel sheet pile, and method of driving compound steel sheet pile |
08/12/2010 | DE202010004381U1 Druckrohr sowie daraus hergestellter Erdanker Pressure pipe and derived ground anchor |
08/12/2010 | CA2749972A1 Arrangement for a down-the-hole hammer drill for use in soil consolidation through jet grouting |
08/11/2010 | CN201546238U Gravity reinforced retaining wall |
08/11/2010 | CN201546224U Structure at joint of PHC tube pile |
08/11/2010 | CN201546223U Rectangular concrete pile |
08/11/2010 | CN201546222U Mobile concrete tailing dumping device |
08/11/2010 | CN101798904A Device for supplying concrete and gas into drill ribbon of drilling device when forming concrete borehole |
08/11/2010 | CN101798854A Hollow concrete member and preparation method thereof |
08/11/2010 | CN101798820A Cast-in-situ bored pile double sleeve for separating contact of piles and earth |
08/11/2010 | CN101798812A Double anchoring section prestressed anchoring system with three-layer protection and anchoring method thereof |
08/11/2010 | CN101798811A Recyclable end-bearing anchor rod |
08/11/2010 | CN101798810A Cement-soil composite pile inserted into reinforced concrete core materials |
08/11/2010 | CN101798809A Non-borrow composite underreamed pile constructing method |
08/11/2010 | CN101798808A Method for producing concrete square pile end plate and special mould thereof |
08/11/2010 | CN101476325B Rigid gridding and pile combined foundation and its use in soft soil foundation reinforcement |
08/11/2010 | CN101429766B Ground strengthened high pressure rotary spraying pile construction technique |
08/11/2010 | CN101298769B Pile concrete filling method aiming at karst cave area |
08/10/2010 | US7771140 Methods for the subterranean support of underground conduits |
08/05/2010 | US20100196103 Stackable mine rock shields |
08/04/2010 | EP2213802A1 Supply device for supplying concrete and glass into the drill ribbon of a drilling device when creating a concrete borehole and method for setting a concrete borehole |
08/04/2010 | EP2212478A2 Method and apparatus for building support piers from one or more successive lifts formed in a soil matrix |
08/04/2010 | CN201538966U Pan-head valve pile toe of tube-sinking cast-in-place pile |
08/04/2010 | CN201538965U Bushing disc pile |
08/04/2010 | CN201538963U Deep and thick soft soil foundation composite strengthening structure of high-speed railway |
08/04/2010 | CN201538934U Collapsible loess tunnel foundation basic structure of high-speed railway |
08/04/2010 | CN101793076A Concrete component with additive and preparation method |
08/04/2010 | CN101793036A Pile shoe damage and water inflow monitoring device of multifunctional self-elevating supporting platform for ocean oil field |
08/04/2010 | CN101793032A Construction method of deep foundation ditch on small place |
08/04/2010 | CN101793030A Prestressed anchor head structure for anchor rod of soil nailing wall |
08/04/2010 | CN101793029A Method for correcting pile deviation |
08/04/2010 | CN101793028A Prefabricated concrete pile for increasing bearing capacity and uplift resistance |
08/04/2010 | CN101793027A Core-grouted static pressure anchor rod pile |
08/04/2010 | CN101793026A Water-stopping capping beam of stirring pile |
08/04/2010 | CN101793025A Tubular pile centrifugal noise reduction device |
08/04/2010 | CN101793024A Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit |
08/04/2010 | CN101793023A Foundation pit construction method |
08/04/2010 | CN101793021A Foundation reinforcing method by using pre-added aggregate stirred pile |
08/04/2010 | CN101255692B Heterotype squeezing-close bottom-enlarging filling pile construction method |
08/04/2010 | CN101250870B Positioning device for filling pile reinforcement cage |
08/03/2010 | US7766581 System, method, and apparatus for independent retention of a locking device on mooring connections |
07/28/2010 | CN201534974U High-pressure jet and mixing foundation seepage-proofing reinforcing equipment with multiple drill bits |
07/28/2010 | CN1982545B Arch press for pile formation apparatus with branched and/or bearing disc |
07/28/2010 | CN101787771A Recycled concrete member with additive and method for preparing same |
07/28/2010 | CN101787718A Casing construction method for reinforcing underground building and structure foundation |
07/28/2010 | CN101787717A Controllable accurate combined inclination correction method |
07/28/2010 | CN101787713A Hydraulic detection device for load of prefabricated tubular pile |
07/28/2010 | CN101787701A Construction method for supporting pine pile in elevator shaft foundation pit |
07/28/2010 | CN101787699A Bolt fastening structure of pipe die |
07/28/2010 | CN101787698A Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof |
07/28/2010 | CN101787697A Method for realizing automatic over-pressure piling and compaction in holes |
07/28/2010 | CN101787696A Pile filling technology of large-diameter bagged concrete |
07/28/2010 | CN101787695A Mobile residual grout pouring device |
07/28/2010 | CN101787694A Fixed residual slurry pouring device |
07/28/2010 | CN101787686A Method for building offshore wind farm |
07/28/2010 | CN101324069B Novel method of grouting under plate |
07/28/2010 | CN101302758B Method for processing prestress square pile |
07/28/2010 | CN101200365B H-shaped flexible concrete ultra-thin cut-off wall and construction method thereof |
07/28/2010 | CN101021070B Cast-in-situ X-shaped concrete pile construction method |
07/28/2010 | CA2665577A1 Base anchor |
07/22/2010 | WO2010082468A1 Combined steel sheet pile, soil retaining wall formed by combined steel sheet pipe, and method for selecting combined steel sheet pile |
07/22/2010 | WO2010081718A2 Ground anchor having lateral stabilizers |
07/22/2010 | US20100180525 Removable stairway |
07/21/2010 | EP2208826A1 Method of preparing air foam stabilizing liquid and method of air foam drilling work |
07/21/2010 | CN201531031U Anchor cable seismic resistant device |
07/21/2010 | CN201531030U Slidable anchorage device for controlling anchoring force |
07/21/2010 | CN201531026U Shock tube soil nail with ribbed roof device |
07/21/2010 | CN201531025U Three-jaw type hydraulic anchor head |
07/21/2010 | CN201531024U Anti-corrosion operation equipment for steel pile |
07/21/2010 | CN201531023U Cast-in-place pile bottom mud jacking valve |
07/21/2010 | CN201531022U Screw pile |
07/21/2010 | CN201531021U Prefabricated member cement-treated-soil drilling and filling pile |
07/21/2010 | CN201531020U Blade drill pipe steel pile special for a surface solar power station |
07/21/2010 | CN101781894A Steel pipe pile locking notch structure and water-stopping method of steel pipe pile cofferdam |
07/21/2010 | CN101781893A Carbon steel pile toe for PHC high-strength concrete pipe pile |
07/21/2010 | CN101781892A Combined pile of pre-stressed wedge-shaped pipe pile and pre-stressed pipe pile |
07/21/2010 | CN101781891A Sand-lined pile and construction method thereof |
07/21/2010 | CN101781890A Screw cast-in-place pile construction method |
07/21/2010 | CN101781889A H-shaped waterproof curtain construction process |
07/21/2010 | CN101781888A Vibration sinking tube compacted gravel-concrete combined pile and construction method thereof |
07/21/2010 | CN101240535B Single-power bidirectional drilling stirring pile machine |
07/21/2010 | CN101215836B Construction machinery used for large diameter hollow pile and its construction method and use |