Patents for E02D 5 - Bulkheads, piles, or other structural elements specially adapted to foundation engineering (16,463) |
---|
12/06/2000 | CN1276031A Improved methods and apparatus for boring and piling |
12/06/2000 | CN1275661A Method and device for double-spiral in situ pouring pile formation |
11/29/2000 | CN1274788A Continuous wall constructing method including drilling holes and late grouting |
11/29/2000 | CN1059008C Construction method of filling pile |
11/29/2000 | CN1059007C Foundation load-bearing pile |
11/29/2000 | CN1059006C Film water wall sinking method |
11/23/2000 | WO2000070152A1 Method and apparatus for soil stabilisation |
11/22/2000 | CN2407037Y Prefabricated component |
11/22/2000 | CN2407036Y Reinforced concrete pile feeder |
11/21/2000 | US6149352 Retaining wall block system |
11/15/2000 | CN2405662Y Powder-spraying device |
11/14/2000 | US6145601 Method and device for boring holes |
11/08/2000 | CN2404926Y Equipment for forming piles having branches and/or seat base on the bottom |
11/08/2000 | CN2404619Y Concrete self-locking inserting-rod and reaming bit therefor |
11/08/2000 | CN1272574A Immersed tube bored concrete composite pile construction method |
11/08/2000 | CN1272573A Lime concrete composite pile and its construction method |
11/07/2000 | US6142712 Hollow screw-in pile |
11/02/2000 | WO2000028156A9 Sheet piling for ground support and site drainage |
11/01/2000 | CN2403821Y Fast connector for steel reinforced concrete precast pile |
11/01/2000 | CN2403820Y Precast construction base pile |
10/31/2000 | US6139225 Method for building an underground continuous wall |
10/25/2000 | EP1046753A1 Method and apparatus for forming piles in place |
10/25/2000 | EP1046752A1 Ground anchor |
10/25/2000 | CN2402728Y Bearing disc hole forming device |
10/25/2000 | CN1057811C Preconstructed pile and its top |
10/24/2000 | US6135675 Sheetpile system including full plastic exterior |
10/19/2000 | WO2000061877A1 Bearing capacity enhancement for piling applications |
10/19/2000 | WO2000061876A1 Building structure and method of making it |
10/18/2000 | EP1045073A1 An excavation tool and a method for forming a column of consolidated soil |
10/18/2000 | CN2401593Y Cement soil foundation wall building machine |
10/18/2000 | CN2401592Y Combined formwork for artificial formed slot hole steel bar concrete bulkhead of underground continuous wall |
10/18/2000 | CN1270649A Screw pile anchor |
10/17/2000 | US6132145 Pumpskid for suction anchors |
10/17/2000 | US6132141 Pipeline buoyancy control assembly and tie-down attachment member therefor |
10/17/2000 | US6131344 Mixed construction material for slit wall of excavation pit lining |
10/11/2000 | CN1057363C Hydraulic extruding-expanding device |
10/10/2000 | US6128867 Ground anchor with stabilizer cap |
10/05/2000 | WO2000047826B1 Short aggregate pier techniques |
10/04/2000 | EP1041240A2 Auger drill |
10/04/2000 | EP1041204A1 A method for anchoring a wall in the ground by means of pull anchors |
10/04/2000 | CN1268603A Recoverable prestressed reinforced concrete revetment pile work method |
09/28/2000 | DE19913229A1 Spreizanker Expansion anchor |
09/27/2000 | EP1039150A2 Expanding anchor |
09/27/2000 | EP1039039A1 Method for making a wall in the ground and drilling element used therewith |
09/27/2000 | EP1039038A1 Form removal apparatus aid |
09/27/2000 | CN2398333Y Pile body containing thorn pile |
09/27/2000 | CN1267769A Device for removing easily shuttering |
09/27/2000 | CN1267768A Construction method of concrete pile base |
09/27/2000 | CN1056897C Pile with side support and its construction method |
09/26/2000 | US6123484 Soil pile and method for constructing the same |
09/26/2000 | US6122847 Method of and apparatus for installation of plate anchors |
09/21/2000 | WO2000055433A1 Method for forming a bulkhead sealed with mortar and the bulkhead manufactured thereby and the tongue-and-groove element for the bulkhead |
09/20/2000 | CN1267263A Pylon servicing apparatus |
09/20/2000 | CN1266930A Water-stop device |
09/19/2000 | US6120214 Process for constructing reinforced subterranean columns |
09/14/2000 | WO2000053852A1 Method for controlling pile casting |
09/13/2000 | CN1266129A Foundation grouting apparatus and method thereof |
09/13/2000 | CN1056433C Construction method and implement for concrete pouring pile |
09/13/2000 | CN1056432C Jetting pipeline sinking piling method |
09/12/2000 | US6116819 Auger piling |
09/06/2000 | CN1265439A Anti-seeping hollow pile |
09/05/2000 | US6113313 Pile wrapper and clamping assembly |
08/31/2000 | WO2000050697A1 Repair of hollow tubular structures |
08/31/2000 | WO2000050358A1 Concrete comprising an elastic substance and pile made of such a concrete |
08/31/2000 | CA2362143A1 Repair of hollow tubular structures |
08/30/2000 | EP1030953A1 Construction fitting |
08/30/2000 | EP1030948A1 Improved methods and apparatus for boring and piling |
08/23/2000 | EP1029133A1 Method of manufacturing a reinforced oblong concrete product for longitudinal load-bearing purposes, and a driven pile |
08/23/2000 | CN2392816Y Three-win diameter-variable bottum-enlarging pile |
08/23/2000 | CN2392815Y Hydraulic broaching machine for drilling |
08/22/2000 | US6106201 Z-shaped sheet pile with high section modulus |
08/22/2000 | US6106200 Process and device for simultaneously drilling and lining a hole |
08/17/2000 | WO2000047826A1 Short aggregate pier techniques |
08/17/2000 | WO2000047825A1 Retaining wall block system |
08/17/2000 | CA2359642A1 Short aggregate pier techniques |
08/16/2000 | CN2391913Y Concrete pile making by usie of bamboo as mould-pipe |
08/16/2000 | CN2391912Y Lubrication formwork |
08/16/2000 | CN2391911Y Bulkhead |
08/09/2000 | CN2390918Y Apparatus for underground continuous wall airlift reverse circulation cleaning out and displacing bulk head stabilizing solution |
08/09/2000 | CN1262363A Prestressed square pile and its making method |
08/09/2000 | CN1262362A Horizontal supporting structure of prefabricated and assembled lattice type enclosed beam and its construction method |
08/08/2000 | CA2031448C Mortar composition |
08/02/2000 | CN2389925Y Rotary spray variable section combined caisson pile |
08/02/2000 | CN2389924Y Screw concrete precast pile |
08/02/2000 | CN1261636A Operation control system of digging machine for cement wall groover |
08/01/2000 | US6094873 Foundation for manufactured homes |
07/27/2000 | DE10002314A1 Work apparatus for production of bore posts involves two so-called bore worms with spiral arrangement with dimensioning, material choice and formation necessary for accommodating forces for function and pushable axially in one another |
07/26/2000 | CN2389247Y Self-locking type ground tackle |
07/26/2000 | CN2389176Y Sealed anchorage cable |
07/25/2000 | US6092346 Method for connecting a sheet pile to a beam |
07/25/2000 | US6092341 Concrete cylindrical body with aseismic base isolation structure, method for manufacturing the same and laminated ring assembly therefor |
07/25/2000 | CA2102826C Composite anchor |
07/25/2000 | CA2026343C Integral earth anchor |
07/20/2000 | WO2000042256A1 Composite auger piling |
07/19/2000 | EP1019584A1 Screw pile anchor |
07/19/2000 | CN2388222Y Reinforced concrete thin wall round eyed square pile |
07/19/2000 | CN1260426A Assembled level-adjustable rigid joint device for precast pile |
07/19/2000 | CN1260425A Making method for reinforced concrete stiff-core cement soil composite pile and its pile and construction equipment |
07/19/2000 | CN1260424A Vibratory pipe sinking dug-hole pile |
07/13/2000 | WO2000040808A1 Method and device for forming a foundation pipe pile in the ground |