Patents for E02D 17 - Excavations; Bordering of excavations; Making embankments (8,601) |
---|
09/22/2010 | CN201588236U Hydraulic grab for construction of underground continuous wall and grab machine |
09/22/2010 | CN201588218U Plastic geocell |
09/22/2010 | CN201588217U Geotechnical cell |
09/22/2010 | CN201588214U Grouting concrete soil nail |
09/22/2010 | CN201588213U Novel anchor |
09/22/2010 | CN201585288U Stepped side slope flower pond |
09/22/2010 | CN101842228A Composite for geotechnics, building and the like, with impermeable layer |
09/22/2010 | CN101838998A Prestressed anchor cable pile sliding wall along river road shoulder and construction method thereof |
09/22/2010 | CN101838992A Method for dry-method compatibilization of valley-type wet-method red dump site |
09/22/2010 | CN101838991A Deep excavation risk evaluation method based on network reasoning |
09/22/2010 | CN101838988A Comprehensive construction method for extracting anchor cable |
09/22/2010 | CN101836547A Method for establishing plant community in East China |
09/22/2010 | CN101836546A Construction method of plant community in northwest region |
09/22/2010 | CN101836543A Method for establishing plant community in North China |
09/22/2010 | CN101285311B Self-adapting slope protection device for preventing slope deforming with waste tyres and belt seeding coating layer |
09/16/2010 | WO2010104235A1 Excavation method of underground plaza and submarine plaza using steel casing retaining wall |
09/16/2010 | WO2010104234A1 Structural steel casing, retaining wall, construction method thereof, and construction method for levee maintenance and road expansion |
09/16/2010 | WO2010103121A2 Road hole cover |
09/16/2010 | DE102009011119A1 Verfahren zur Stabilisierung eines Damms oder einer Halde auf weichem Grund und Damm oder Halde nach diesem Verfahren hergestellt A method for stabilizing a dam or a heap on soft ground and dam or dump produced by this method |
09/15/2010 | CN201581405U Biological bag |
09/15/2010 | CN201581404U Isolated retaining wall |
09/15/2010 | CN201581403U Adjustable four-way valve for steel bracing strut |
09/15/2010 | CN201581402U Structure of single-head movable end in steel bracing strut |
09/15/2010 | CN201581387U Sensor terminal |
09/15/2010 | CN101831914A Method for protecting and greening rocky side slope |
09/15/2010 | CN101545262B Method for embankment by blasting and silt squeezing on complex soft foundation |
09/15/2010 | CN101220596B Advanced support active pressure reduction structure for side slope and construction method |
09/10/2010 | WO2010101361A2 Environmentally-friendly greening composition promoting ecological restoration and method for greening slope face using the same |
09/10/2010 | WO2010099711A1 Ecological slope-protected formwork used in pouring concrete |
09/09/2010 | DE202010009750U1 Lärmschutz-Gabione Noise Abatement gabion |
09/08/2010 | EP2226427A2 Excavation apparatus |
09/08/2010 | CN201574418U Automatic slope cutting machine |
09/08/2010 | CN201574401U Underground continuous wall |
09/08/2010 | CN201574400U Soil body strengthening engineering device |
09/08/2010 | CN201574399U Greening coir log |
09/08/2010 | CN201574398U Pure ecological soil reinforcement protective layer for rock side slope |
09/08/2010 | CN201574397U Upright retaining wall type ecological slope protection |
09/08/2010 | CN201574396U Retaining wall device for excavated foundations |
09/08/2010 | CN201574387U Vegetating coir fiber net |
09/08/2010 | CN101824962A Jet mixing drilling tool and method with the same for soil mass supporting construction |
09/08/2010 | CN101824826A Mesh structure |
09/08/2010 | CN101824825A Deep foundation pit open cutting construction method |
09/08/2010 | CN101824824A Construction method of controlling raised deformation of existing buildings under foundation pits through pile slab supporting and protection |
09/08/2010 | CN101824823A Construction method of enclosure structure with ultra-short underground walls |
09/08/2010 | CN101824810A Method for protecting river bank by sand-river pile group and flexible mattresses |
09/08/2010 | CN101597896B Method for building riprap levee island wall of offshore artificial island by large box barge |
09/08/2010 | CN101457524B Foundation ditch ballast balance supporting method |
09/08/2010 | CN101294390B Support system and construction method for smoothening-digging partial center island foundation pit |
09/08/2010 | CN101016735B Construction method of underwater dam body fast continuous placing large artificial island |
09/07/2010 | US7789201 Gear unit and method for controlling an internal pressure in the gear unit |
09/02/2010 | WO2010068014A9 Temporary soil retaining wall structure for water supply and drainage works deep underground |
09/02/2010 | WO2010068013A9 Temporaty soil retaining wall structure for water supply and drainage works in low depth |
09/01/2010 | CN201567582U Rainwater saving device of foundation pit |
09/01/2010 | CN201567581U Pit enclosure structure for performing shield traversing construction at lower part |
09/01/2010 | CN201567580U Ecological net |
09/01/2010 | CN201567579U Foundation pit supporting structure of gantry pine pile anchored rod |
09/01/2010 | CN201567578U Anti-seepage subdam |
09/01/2010 | CN201567574U Prestressed anchorage anchor pier slope reinforcing and fixing structure |
09/01/2010 | CN201567567U Fender pile capable of being reused |
09/01/2010 | CN201567561U Geomembrane with rough surface and smooth edge |
09/01/2010 | CN201567557U Self-adapting flexible body structure side slop drainage channel |
09/01/2010 | CN201565367U Special nozzle for slope protection soil replacement planting through spraying |
09/01/2010 | CN101818590A Method for building flexible structure |
09/01/2010 | CN101818503A Construction method of small span foundation trench with filling concrete sliding masses on two sides and support structure thereof |
09/01/2010 | CN101818499A Revegetation system on steep rocky slopes and implementing method thereof |
09/01/2010 | CN101818496A Inversely-constructed underground continues wall with siamesed reinforcing cage |
09/01/2010 | CN101560757B Seepage-intercepting and pollutant-removing system of large channel non-water passing slope |
09/01/2010 | CN101550690B Triangular concrete thin-wall folded plate pile and preparation method thereof |
09/01/2010 | CN101418571B Middle plate construction method of wide pit top-down construction |
09/01/2010 | CN101153492B Horizontal frame construction and underground fending method using the same |
09/01/2010 | CN101139839B Setting arrangement for high artesian area ultra-deep foundation pit |
09/01/2010 | CN101139838B Construction method for high artesian area ultra-deep foundation pit |
08/31/2010 | CA2588196C Degradable erosion control barrier |
08/31/2010 | CA2482720C Erosion blanket installation device |
08/26/2010 | WO2010095817A2 Retaining wall for planting, with water reservoirs for soil provided behind the retaining wall, and method for constructing same |
08/26/2010 | WO2010094607A1 Expansion frame |
08/26/2010 | US20100212560 Geomat |
08/26/2010 | US20100212559 A planting slope structure |
08/26/2010 | DE202010007345U1 Verbundbaustoff zum Sichern von Böschungen Composite building material for securing of slopes |
08/25/2010 | CN201560430U Ramp protective brick |
08/25/2010 | CN201560429U Heap dam structure using red mud generated by alumina produced by gibbsite as material |
08/25/2010 | CN201560419U Antiskid fixing buckle of filling bag for construction use |
08/19/2010 | WO2010053349A3 Botanical arrangement and display apparatus |
08/19/2010 | US20100209199 Interlocking shoring panel and methods of use thereof |
08/19/2010 | DE102009009406A1 Spreizrahmen Spreading |
08/18/2010 | EP2218829A2 Cutting bit for a slotted wall cutter |
08/18/2010 | CN201554029U Energy-dissipating device used for steel wire stay rope |
08/18/2010 | CN201554028U Root-type deep-hole drainage pile |
08/18/2010 | CN201554027U Splicing pipe structure of steel bracing strut |
08/18/2010 | CN201554026U Metro steel surrounding purlin |
08/18/2010 | CN101806150A Effective and safe anti-slide pile construction method |
08/18/2010 | CN101806068A Method for supporting side wall of deep foundation pit |
08/18/2010 | CN101806067A Construction method of underground continuous wall joints by using air bag |
08/18/2010 | CN101806066A Method for molding vertical wall of deep foundation pit |
08/18/2010 | CN101806065A High-rise and superhigh-rise large-size building pile driver and pile pressing method |
08/18/2010 | CN101298777B Method and device for preventing land slide of swelled ground |
08/17/2010 | US7775743 Erosion control device and method of use |
08/17/2010 | CA2398414C Organic composition for erosion control and barrier formation |
08/12/2010 | WO2010088929A1 Foundation for buildings |
08/12/2010 | DE102009008516A1 Method for securing upper end of mine-duct filled with poriferous mass against breakage of ground, involves filling of reinforced and non-reinforced concrete in hollow drill that is pulled before concrete solidification |