Patents for E01B 2 - General structure of permanent way (773)
03/2010
03/31/2010CN201433333Y Built-in barricade type slab ballastless track
03/24/2010CN201428094Y Novel railway track
03/18/2010US20100065651 Solid track comprising a concrete strip
03/18/2010DE102008046901A1 Streustromisolierter Fahrbahnweg für schienengebundene Fahrzeuge Stray current Insulated Fahrbahnweg for rail vehicles
03/17/2010CN101671979A Ballastless railway
02/2010
02/24/2010EP2155965A1 Structure of high-strength and rapidly-hardening prepacked concrete track for carrying out mechanization and working method thereof
02/24/2010CN101654899A Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway
02/17/2010EP2154290A1 Ballast stopping work, bedded track
02/03/2010CN201395750Y Arrangement of support for track section
01/2010
01/20/2010CN201388164Y Power generation guiding rail
01/20/2010CN201386241Y Composite rail
12/2009
12/30/2009CN201372393Y Curve track of small semi-diameter
12/23/2009CN101608419A Desert area migratory dune land railway bed construction method
12/16/2009CN201362808Y Novel rail and track thereof
12/16/2009CN201362807Y Track girder subgrade for large walking crane
12/16/2009CN101603282A High speed railway collapsible loess tunnel foundation base configuration
10/2009
10/29/2009DE202008008157U1 Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich Rail track, in particular for a tunnel or bridge area
10/28/2009CN100554582C Double crossed vehicle running track
10/15/2009DE10107827B4 Verfahren zur Herstellung und zur Lagerung eines Betonbauteiles für eine Feste Fahrbahn eines schienengeführten Fahrzeuges sowie deren Lagerung Process for the preparation and storage of a concrete part of a slab track of a rail-guided vehicle as well as storage
09/2009
09/30/2009CN201317896Y CFG pile and tubular pile road embankment reinforcing system
09/09/2009CN201305796Y Anti-seismic rail board
08/2009
08/20/2009DE202009008366U1 Schienenfahrbahn, insbesondere für einen Tunnel- oder Brückenbereich Rail track, in particular for a tunnel or bridge area
08/19/2009CN101509215A Foundation special for city rail electric locomotive and continuous power supply system over-journey
08/12/2009EP1904682B1 Fixed running track on a bridge structure
07/2009
07/30/2009DE102008006273A1 Schallschutz und seitliche Einfassung des Schotteroberbaus für Gleisanlagen schienengebundener Fahrzeuge Sound insulation and side mount the ballast superstructure for railway tracks rail vehicles
07/15/2009CN100513687C 铁轨系统 Rail system
06/2009
06/24/2009EP2072681A2 Console for temporarily installed rails
06/10/2009CN101454508A Guideway
06/04/2009WO2009068169A1 Method for compacting a ballast bed and device for carrying out the method
06/02/2009CA2446646C Track covering
05/2009
05/20/2009DE102007054221A1 Oberbau für eine Schienenfahrbahn Superstructure for a rail track
05/06/2009CN101424061A Unballasted track construction
04/2009
04/09/2009DE102007046249A1 Track system for rail-bound vehicle, has trough body comprising groove for accommodating rail, where trough body is secured to plastic mass in longitudinal recess formed at upper side of base carrier
03/2009
03/18/2009CN201209235Y Ballastless track telescoping device for wide span bridge end of passenger dedicated line
03/18/2009CN101387102A Concrete unit for fixing the run road of rail vehicle
02/2009
02/25/2009CN201198550Y Elastic bearing for float placing plate rail system
02/11/2009EP2021545A1 Guideway
01/2009
01/07/2009CN201176548Y Foundation structure of pipe-based railway slab bridge without beam
12/2008
12/25/2008US20080315002 Fixed Carriageway for Rail Vehicles
12/24/2008CN100445059C Maintenance for orbital plates
12/10/2008CN201162160Y Handling and disassembling device of rail seat template
12/10/2008CN201162159Y Mortar pouring apparatus with rail seat as orientation
11/2008
11/26/2008EP1994225A1 Track bed structures
11/05/2008CN201144367Y 轨道梁 Track Beam
10/2008
10/29/2008CN201141103Y Reinforcement lapping insulation card
10/23/2008WO2008126973A1 Structure of high-strength and rapidly-hardening prepacked concrete track for carrying out mechanization and working method thereof
10/01/2008EP1974099A1 Method for producing a ballastless track
09/2008
09/24/2008CN101270568A Rail plate technique for resolving rail bridge connection of crossbeam seam section
09/24/2008CN101270559A Floating plate rail structure with combined spring support
09/17/2008CN201116366Y Bridge orbit longitudinal separation device
09/17/2008CN201116365Y Sliding layer used for bridge orbit longitudinal separation device
09/17/2008CN100419162C Track cover
09/03/2008EP1964973A2 Method for manufacturing a supply line channel and train consisting of vehicles for executing the method
09/03/2008CN101255673A Double-rail-head steel rail and composed double-rail track
08/2008
08/20/2008CN101245575A Method for building second-line railway road-bed near existent over loading railway
08/20/2008CN101245574A Method for building over loading railway road-bed on salting ground
08/06/2008CN201095717Y Red beds filled high-speed railway roadbed
08/06/2008CN201095716Y Slag-free orbit reinforced concrete pile net structure roadbed
07/2008
07/23/2008CN201089872Y Rail expansion device
07/16/2008EP1523597B1 Track with a levelling curve and force-minimal superelevation ramp
07/16/2008CN101223317A Fixed running track on a bridge structure
06/2008
06/18/2008CN101200872A Bottom bearing box beam for rail traffic station
06/18/2008CN101200871A Bottom bearing trough girder for rail traffic station
06/04/2008CN101194071A Ballastless track for rail vehicles
04/2008
04/30/2008CN201053091Y Reinforcing bar cement concrete railway roadbed
04/02/2008EP1904682A1 Fixed running track on a bridge structure
03/2008
03/27/2008DE202006017671U1 Stoßstelle zwischen zwei aus Beton bestehenden Längsschwellen Joint between two existing concrete longitudinal sleepers
03/26/2008EP1902179A1 Fixed road surface in a tunnel
03/26/2008CN201040831Y Stainless steel composite steel plate bridge floor structure for railway steel bridge
03/19/2008CN101144256A Slag-free orbit reinforced concrete pile net structure roadbed and construction method thereof
03/05/2008EP1895052A1 Support structure with low level of vibration for railway
02/2008
02/20/2008EP1888843A1 Ballastless track for rail vehicles
02/13/2008CN101122109A Railway road
02/07/2008DE102007009271A1 System for building emergency exits or escape routes in railway tracks, has bearing surface formed by multiple module elements arranged one behind other, and are connected with one another, which are held over one or more spacer
01/2008
01/23/2008CN201010834Y Exclusive railway assorted with freeway
01/23/2008CN201010833Y Floating plate rail structure with combined spring support
01/09/2008CN100360742C Plated rail without ballast
01/01/2008US7314182 Extruded railroad tie for use with steel tie
12/2007
12/19/2007EP1867786A2 Railway bridge for a rail system
12/06/2007WO2007137909A1 Guideway
12/05/2007CN200985476Y Several types steel rail concrete sleeper and boltless fastener system
10/2007
10/03/2007CN101046074A Track set with auxiliary track
09/2007
09/26/2007CN101041939A Double crossed vehicle running track
09/07/2007WO2007099353A1 Track bed structures
08/2007
08/09/2007DE19706542B4 Fahrbahn Lane
08/02/2007US20070176012 Rail system
07/2007
07/26/2007WO2007082519A1 Method for producing a ballastless track
07/26/2007CA2637208A1 Method for producing a ballastless track
07/19/2007WO2007062646A3 Tubular, hollow, solid guideway beams
05/2007
05/23/2007CN1966857A Road for rail vehicle and manufacturing method thereof
05/16/2007CN1965129A Anchoring assembly, anchor bar and method for producing an anchoring assembly
05/02/2007EP1102903B1 Tyre foundation structure
04/2007
04/25/2007EP1470294B1 Device for adjusting the width of a track
04/19/2007DE102005007097A1 Underground pipe/-tunnel or railroad for rail transport system, has inclination in driving direction from stopping place, where driving direction brakes or slows down rail vehicle during drive by gravitational force
04/18/2007EP1775381A1 Underground track replacement in tube tunnels
04/17/2007US7206727 Method for designing generalized spirals, bends, jogs, and wiggles for railroad tracks and vehicle guideways
03/2007
03/29/2007WO2007034224A1 Railway arrangement
02/2007
02/21/2007EP1753916A1 Anchoring assembly, anchor bar and method for producing an anchoring assembly
02/21/2007EP1339918B1 Arrangement for changing a gauge of a railed vehicle
02/21/2007CN2871610Y Pathway unit with auxiliary rail
1 2 3 4 5 6 7 8