Cooper Park Playground
Cooper Park playground was installed in 1998 and has been a popular attraction. This has resulted in increased wear and tear and the need for a playground replacement.
The installation of a new playground has concluded. With it included ADA-accessible features, rubber surfacing, new pathways, benches, and a replaced bike rack.
Cooper Park playground was installed in 1998 and has been a popular attraction. This has resulted in increased wear and tear and the need for a playground replacement.
The installation of a new playground has concluded. With it included ADA-accessible features, rubber surfacing, new pathways, benches, and a replaced bike rack.
-
CLOSED: This survey has concluded.
Share your thoughts on the playground options by participating in the survey.
The survey itself should take less than 10 minutes to complete. Your feedback and insight will be used to help shape plans at Cooper Park.
Thank you for taking time to contribute your voice to this project.
Share Playgrounds Survey - Cooper Park on Facebook Share Playgrounds Survey - Cooper Park on Twitter Share Playgrounds Survey - Cooper Park on Linkedin Email Playgrounds Survey - Cooper Park link -
CLOSED: This survey has concluded.
Over the Summer and Fall of 2022, Parks engagement staff asked neighbors and Friends of Cooper Park what kind of slide and fun feature they would like to see in their new playground. 64% of the 295 respondents were between the ages of 0 and 12. Respondents had a preference for the Rushwinder Slide and the Helix Net Climber. The proposed designs incorporate those features.
This new survey is asking for your preference between the two designs and should take less than 5 minutes to complete. Click on the playground image to make it larger.
Thank you for taking time to contribute your voice to this project.
Share Playground Design Survey - Cooper Park on Facebook Share Playground Design Survey - Cooper Park on Twitter Share Playground Design Survey - Cooper Park on Linkedin Email Playground Design Survey - Cooper Park link
Project Location
Project Stage
-
Plan
Cooper Park Playground has finished this stageDuring the planning stage we complete site surveys, feasibility studies, and gather additional information to develop project goals, outcomes and budgets.
-
Envision
Cooper Park Playground has finished this stageWith community input, we develop potential project solutions, identify funding sources and make budget requests.
-
Design
Cooper Park Playground has finished this stageThe design stage can include several phases, including concepts, iterations, final design and engineering design plans. Once design is complete we develop technical renderings and construction plan documents.
-
Construction Ready
Cooper Park Playground has finished this stageDuring this stage requests for bids are issued and contractors are selected. Sometimes projects may wait in this stage until construction funding is secured.
-
Construction
Cooper Park Playground has finished this stageConstruction is underway and will follow the construction plan - which may include several phases. During this stage facility and road closures may be needed.
-
Close Out
Cooper Park Playground has finished this stageConstruction has ended and final reviews are underway.
-
In Use
Cooper Park Playground is currently at this stageThe project is open to the public for use.